XCP-ng
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Groups
    • Register
    • Login

    Lock file is already being held whereas no backup are running.

    Scheduled Pinned Locked Moved Backup
    2 Posts 2 Posters 8 Views 2 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • henri9813H Offline
      henri9813
      last edited by henri9813

      Hello,

      Sometimes, i have on some jobs ( which run every 4 hours ).

      30c3a82e-1e48-4d09-8e36-514066e11352-image.png

      Howerver, the previous job is finished in success
      2bc2ed36-391c-4e02-b8d7-a40e9e7513a3-image.png

      Is it possible that has a relation with the mergeWorker of backups which could be running ? if it doesn't finished his operations ?

      Example of logs:

      xen-orchestra      | 2025-11-27T00:44:43.487Z xo:backups:mergeWorker INFO merge in progress {
      xen-orchestra      |   done: 2057,
      xen-orchestra      |   parent: '/xo-vm-backups/f37e259d-beaa-7617-e6f1-be814f21e056/vdis/29e0185e-2f67-44d4-bb9e-ee2a772e2543/b09c0230-219f-4ddf-8e19-bfed1464014f/20251126T070610Z.vhd',
      xen-orchestra      |   progress: 25,
      xen-orchestra      |   total: 8128
      xen-orchestra      | }
      

      Is it possible to have this in the XO Tasks sections ? it's interessant to see this.

      Best regards

      F 1 Reply Last reply Reply Quote 0
      • F Offline
        flakpyro @henri9813
        last edited by

        @henri9813 This is 100% related to the merge process still running in the background. I have seen it happen myself.

        1 Reply Last reply Reply Quote 0
        • First post
          Last post