I am looking to automate backups for a VM on XCP-NG that has vUSBs attached. I was thinking of a job sequence that went something like this: shut down vm, remove vusb, backup, reattach vusb, start up vm. Is this possible with Xen Orchestra jobs? Is there any better way to do this?
Posts made by w21froster
-
Remove VUSB as part of job