XCP-ng
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Groups
    • Register
    • Login

    XOA 6.0.3 Backup Job Failure and VDI Export Hang

    Scheduled Pinned Locked Moved Backup
    1 Posts 1 Posters 13 Views 1 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • planedropP Offline
      planedrop Top contributor
      last edited by

      I updated an environment over to 6.0.3 over the weekend, it worked fine for my first 2 nightly backups, but the one from last night failed for most of my VMs.

      Specifically, the backup to Backblaze B2 failed, our SMB backups worked just fine.

      The error I am seeing on the backup is "the write IncrementalRemoteWriter has failed the step writer.beforeBackup() with error . It won't be used anymore in this job execution."

      I then also noticed that, for one of the failed VMs, there is a pool task stuck for "Exporting content of VDI (VDI name) through NBD" and it's stuck at 43% and hasn't moved at all for a while.

      The XOA VM is also not using a lot of bandwidth or anything so I don't think it's actually backing up this VDI anymore but it's also not cancelled.

      1 Reply Last reply Reply Quote 0
      • First post
        Last post