XCP-ng
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Groups
    • Register
    • Login

    Delta Backups

    Scheduled Pinned Locked Moved Backup
    13 Posts 3 Posters 196 Views 2 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • I Offline
      IanMcLachlan
      last edited by

      Thanks for the reply.

      I can schedule jobs OK, but I want the "full" delta copy to run at 12am and the other deltas the rest of the time. In scheduling, there is no way I can see that says the run 12am full.

      Hope this makes it a little clearer.

      Regards

      D 1 Reply Last reply Reply Quote 0
      • D Offline
        DustinB @IanMcLachlan
        last edited by

        @IanMcLachlan Are you trying to run multiple types of backups in the same job? Can you show us your "Backup Jobs" overview page?

        ForzaF 1 Reply Last reply Reply Quote 0
        • I Offline
          IanMcLachlan
          last edited by

          Here is a copy of the schedule. So the job at 12am (0) I want to run full

          b55d29c2-bb36-4b9f-b05e-8a4c0a6a40fc-image.png

          1 Reply Last reply Reply Quote 0
          • ForzaF Offline
            Forza @DustinB
            last edited by

            @DustinB said in Delta Backups:

            @IanMcLachlan Are you trying to run multiple types of backups in the same job? Can you show us your "Backup Jobs" overview page?

            I think he is referring to the full backup interval option: https://docs.xen-orchestra.com/incremental_backups#key-backup-interval
            364264b1-9fcd-4f94-9b93-d328512c6ec7-image.png

            D 1 Reply Last reply Reply Quote 0
            • I Offline
              IanMcLachlan
              last edited by

              Yes, exactly. It's the full backup interval. Sorry if I didn;t make that clear.

              1 Reply Last reply Reply Quote 0
              • D Offline
                DustinB @Forza
                last edited by

                @Forza Yeah that was what I was getting to thinking, the issue you'll have @IanMcLachlan is you won't be able to have a single job schedule that runs at a separate time than what you're displaying.

                You'd likely need to have a new schedule as shown below and enable the "Force Full Backup" option and have this job scheduled to run at your selected time.

                d0ef1e26-6d9a-4798-b3cf-b67538b8f4af-image.png

                1 Reply Last reply Reply Quote 0
                • I Offline
                  IanMcLachlan
                  last edited by

                  Thanks again for the replies.

                  Yes, that was my thinking I would need 2 schedules on same delta job with the 12am set as forced. I was worried the first schedule would still do a full at some point.

                  It's just a shame, it works great currently, besides the fact the full runs at 8am. Based on my original post I assume that the first time I created the job, it was before 8am therefore it did a full and carried on from there.

                  Based on this I know I could recreate the job after 5pm with same schedule and it would probably work, however, its a bit tricky getting access then. I was hoping I was missing at setting somewhere.

                  I appreicate your help guys !!!

                  D 1 Reply Last reply Reply Quote 0
                  • D Offline
                    DustinB @IanMcLachlan
                    last edited by

                    @IanMcLachlan said in Delta Backups:

                    Thanks again for the replies.

                    Yes, that was my thinking I would need 2 schedules on same delta job with the 12am set as forced. I was worried the first schedule would still do a full at some point.

                    It's just a shame, it works great currently, besides the fact the full runs at 8am. Based on my original post I assume that the first time I created the job, it was before 8am therefore it did a full and carried on from there.

                    Based on this I know I could recreate the job after 5pm with same schedule and it would probably work, however, its a bit tricky getting access then. I was hoping I was missing at setting somewhere.

                    I appreicate your help guys !!!

                    Why are you having issues getting access to the infrastructure after a certain time? This should always be running and all you'd do is add another schedule to the same job, forced as a full. You'd likely want to prevent any other jobs from occurring at the same time, but otherwise it would all just work.

                    I 1 Reply Last reply Reply Quote 0
                    • I Offline
                      IanMcLachlan @DustinB
                      last edited by

                      Issue with access isn't infrastructure related, more my own personal logistics. Regards

                      D 1 Reply Last reply Reply Quote 0
                      • D Offline
                        DustinB @IanMcLachlan
                        last edited by

                        @IanMcLachlan said in Delta Backups:

                        Issue with access isn't infrastructure related, more my own personal logistics. Regards

                        Okay... um to separate that then, are you able to explain the need for access after 5PM where a scheduled job wouldn't suffice and then you could review the results after the fact?

                        1 Reply Last reply Reply Quote 0
                        • I Offline
                          IanMcLachlan
                          last edited by

                          Hi Guys,

                          Just to report back. Got it working. Two ways to do this.

                          1.) Create 2 schedules for one backup job, forcing one to run as full.
                          2.) Run backup until the next backup interval is going to do a full. Disable backup, and wait until a time that when enabled will hit the time you want the full to run. In my case after 5pm. I appreciate this way is not practical, but does work.

                          12291419-456e-4cd7-8a67-5cc6430a9c4f-image.png

                          Appreciate you help guys !!

                          1 Reply Last reply Reply Quote 0
                          • First post
                            Last post