XCP-ng
    • Categories
    • Recent
    • Tags
    • Popular
    • Users
    • Groups
    • Register
    • Login

    UI Bug when falling back to Full Backup

    Scheduled Pinned Locked Moved Backup
    4 Posts 4 Posters 94 Views 3 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • F Online
      flakpyro
      last edited by

      I had a job what was interrupted for some reason during its backup run, upon retrying a full backup was required (expected) however the UI shows contradicting information about the VMs backup job.

      1f2b9acf-cb64-48df-8291-8d4872a08fa1-image.png

      I think ideally it should be clarified that a Delta is not running but instead a full? (At the bottom)

      A 1 Reply Last reply Reply Quote 0
      • A Offline
        Andrew Top contributor @flakpyro
        last edited by

        @flakpyro I see the same issue.

        1 Reply Last reply Reply Quote 0
        • olivierlambertO Offline
          olivierlambert Vates 🪐 Co-Founder CEO
          last edited by

          Ping @florent

          florentF 1 Reply Last reply Reply Quote 0
          • florentF Offline
            florent Vates 🪐 XO Team @olivierlambert
            last edited by

            @olivierlambert that is a discrepancy between what was planned ( a vm delta backup) and what we can do with the data available ( a full ) . In this case, it's only one disk that fell back to full

            We have to improve how to show the information with mixed state

            1 Reply Last reply Reply Quote 1
            • First post
              Last post